A room can look and feel dry to the touch while moisture meters still show trapped moisture inside wall cavities or under flooring.
We calculate air mover and dehumidifier placement using psychrometric formulas, not a flat per-room equipment count.

A calculated drying plan means faster results with the right amount of equipment, not excess.
Our Olga, WA jobs run commercial LGR equipment sized to the calculated moisture load.
Thermal imaging cameras reveal moisture patterns behind walls and under flooring that aren't visible to the eye.
Daily logs give you and your insurer verifiable proof of progress, not a technician's word.
Structural drying is a distinct phase with its own methodology, separate from initial extraction, and here's how our Olga, WA crews run it.

The assessment sets the baseline every later reading gets measured against.
We map the full extent of moisture intrusion before placing a single air mover.
Dehumidifier capacity is matched to the calculated moisture load for that specific space.
Documented logs track the numbers from day one through final verification.
Specialty drying protocols protect materials that standard drying speed could damage.
We provide a written verification report confirming the structure has reached dry standard.
A quick call helps us determine whether thermal imaging and full drying equipment are needed.
Equipment for psychrometric assessment is standard on every drying dispatch.
A full diagnostic assessment comes before any equipment placement or pricing.
A written verification report backs the final sign-off.

"The thermal imaging found moisture behind a wall that looked completely fine from the outside. Would have missed it otherwise." — Julian R.
"They came back every single day to take readings and showed me the numbers improving. Felt like real science, not guesswork." — Monique T.
"Our hardwood floor didn't warp because they slowed the drying process down specifically for it." — Grant P.
A room can look dry on the surface while moisture meters still detect trapped moisture inside materials.
It's the technical foundation behind Structural Drying And Dehumidification rather than a marketing term.
Most jobs run 3-5 days, though hardwood and cabinetry may need longer, more controlled drying.
You'll see the actual numbers improve each day through documented logs.
We adjust the drying plan whenever sensitive materials are involved.
We reassess the plan, since stalled readings usually mean equipment placement or capacity needs adjusting, not just more time.
Our Olga, WA drying teams cover Olga and nearby communities with thermal imaging and LGR equipment staged for dispatch.

Speak directly with our structural drying team.
Call +1-844-833-1325